Deliverables

Deliv.
Deliverable name
WP/Task number
Short name of lead participant
Type
Disemination level
Date
Date Submitted
Downloads
1.1
Review of sites at threat 1/1.1 CEFAS R PU M18  

Review of monitoring of environmental threats and pressures in Europe 

1.2

Scientific strategy  1/1.2 CNRS PU M18/M44    

1.3

A sustainable legal, governance and financial structure for JERICO RI

1/1.5

MI R CO M38    

1.4

Report on the JERICO roadmap for the future  1/1.6 COVATEC R PU M48    

2.1

Report on new network systems: status of HF-
radar systems and cabled coastal observatories. 

2/2.3

AZTI, HZG   PU M12 7 December 2016 

2.2

Report on new network sensors. 

2/2.4

HZG, NIVA  R  PU M18    Report on new network sensors 

2.3

Report on initiated network harmonization actions..

2/2.2

 

 HCMR, CNR PU  M30    

2.4

Report on Best Practice for new network systems: HF-radar /cabled coastal observatories.

2/2.3 HCMR, CNR  PU  M40    

2.5

Report on Best Practice for new network sensor.  2/2.4  HZG, NIVA  PU  M42    

2.6

Report on project activities relating to calibration and assessment.

2/2.5  Ifremer, OGS  CO  M46    

2.7

The “JERICO Label”, version 2  2/2.5 OGS, HCMR   PU M48    

3.1

Synthesis report after developments dedicated to the observation of the phytoplankton diversity

3/3.1 SMHI, SYKE  R  PU M24    

3.2

Report on the technical and analytical improvements of innovative techniques and recommendations on their use.

3/3.1  CNRS PU  M42    

3.3

 

Report on first methodological improvements on retrieval algorithms and HF radar network design

3/3.2  CNR-ISMAR  PU M24     

3.4

 

Report on final assessment of methodological improvements and testing on infrastructures

3/3.2 CNR-ISMAR  R PU  M46     

3.5

Report on development of profile coastal waters (MASTODON2D and YOYO systems) 

3/3.3 Ifremer R, DEM  PU  M38    

3.6

Report on the JELAB instrument performance and trials at sea

3/3.3  HCMR  R, DEM  PU  M40    

3.7

Progress report after development of microbial and molecular sensors

3/3.4  IRIS   PU M24    

3.8

Results after development of microbial and molecular sensors

3/ 3.4  Ifremer IRIS R, DEM  PU M42    

3.9

Final report Final report on improved carbon system sensor

3/3.5 NIVA   PU M36    

3.10

Report on developments dedicated to monitor and study benthic comportment and processes

3/3.6 Ifremer & CNRS  PU M24    

3.11

Optimal OSE/OSSE infrastructure including biogeochemical transport

3/3.7  CMCC   PU M12    

3.12

Improved Radar DA technology for biochemical transport analysis

3/3.7 HZG  PU  M18    

4.1

Approaches to monitor European coastal seas 4/4.1-6 COVATEC  P M9 27 June 2016  Approaches to monitor European coastal seas 

4.2

Progress report #1  4/4.1-6 Ifremer  P M13 6 December 2016  Progress report #1 

4.3

Progress report #2  4/4.1-6 Ifremer   P M24    

4.4

First valorisation results for each region  4/4.1-6  Ifremer M36    

4.5

JRAP Synthesis and contribution, to the strategy for the future

4/4.7  CNRS M43     

5.1

Recommendations on open and free data policy  5/5.1  EuroGOOS   PU M24    

5.2

Release of a JERICO-NEXT catalogue comprising data and products

5/5.1 MARIS   PU M36     

5.3

Specifications for a European FerryBox data management system

5/5.1 SMHI  PU  M24    

5.4

Report on Quality Control Steps of marine biological data management

5/5.2 VLIZ   PU M12 27 February 2017  Report on Quality Control Steps of marine biological data management

5.5

Document describing the biological data  5/5.2 VLIZ  PU M48    

5.6

 

Requirements specifications for the observatory operator console

5/5.3  Ifremer   PU M16    Requirements specifications for the observatory operator console 

5.7

Definition of SWE templates for the targeted observatory networks. 

5/5.3  Ifremer  PU M24    

5.8

Assessment of the reached/missed target requirements

5/5.3   CNR-ISMAR  PU M44    

5.9

Report on data management best practices and Generic Data and Metadata models

5/5.4  CNR-ISMAR PU  M20    

5.10

Report on harmonisation with SCOR WGs  5/5.4 CNR-ISMAR   PU M36    

5.11

Best practices for quality control of sensor based biochemical data

5/5.5 SMHI  PU  M24    

5.12

Software for QC of biochemical data from FerryBox and fixed platforms

 5/5.5 SMHI  Other   PU  M40    
 5.13

Recommendation Report 1 for HFR data implementation in European infrastructures 

5/5.6  AZTI  PU  M16  8 March 2017   Recommendation Report 1 for HFR data implementation in European infrastructures 
 5.14  

Recommendation Report 2 on improved common procedures for HFR QC analysis

5/5.6  AZTI  PU  M36     
5.15   Guideline for the calibration of glider data 5/5.7  SOCIB   R  PU M36     
 5.16 

Adapting JERICO-NEXT activities to a Virtual Access infrastructure: Needs and requirements. Survey on the existing technologies

5/5.8  ETT  PU  M18  8 March 2017  Adapting JERICO-NEXT activities to a Virtual Access infrastructure: Needs and requirements. Survey on the existing technologies 

6.1

Intermediate Report  6 Cefas  PU M30    

6.2

Final Report  6 Cefas   R PU M48     

7.1

Description of facilities participating to the TNA program

CNR   PU M9  28 April 2016  Description of facilities participating to the TNA program 

7.2

Trans National Access Provision V1 – Intermediate statistics on access provided by beneficiaries

CNR   R PU M30     

7.3

Trans National Access Provision V2 – Final statistics on access provided by beneficiaries

7 CNR PU  M48    

8.1

Establishment of end-user panel 8/8.1 UOM   Other CO  M8  7 July 2016   Establishment of end-user panel 

8.2

Three visualisation products targeted at stakeholder and public end-user groups

8/8.2 BL  DEC PU  M48    

8.3

Three visualisation products targeted at research and policy end-user groups

8/8.3 Cefas  DEC  PU M48     

8.4

Final report on 3 workshops on new environmental monitoring technologies.

8/8.4 SLR   Other  PU M40     

8.5

Summer School 1 8/8.5 UOM   Other  PU M24     

8.6

Summer School 2  8/8.5 Deltares   Other   PU M36     

8.7

Launch of revised Jerico-Next website  8/8.6 BL  DEC   PU M12  6 September 2016  Launch of revised Jerico-Next website 

8.8

Jerico Data Portal  8/8.7  ETT  DEM   PU M6, 24, 42  19 May 2016  Jerico Data Portal 

8.9

Rules and procedure for TNA 8/8.8 CNR  PU  M8   28 April 2016  Rules and procedure for TNA

8.10

Technical and scientific advancements of TNA  8/8.9 CNR  R  PU M24     

8.11

Final report on TNA program  8/8.9 CNR  PU M47     

8.12

Template for periodic assessments  8/8.9  Cefas PU  M8  1 August 2016  Template for periodic assessments 

8.13

Report on periodic assessments  8/8.9  Cefas  PU M24     

8.14

Final report on VA programme  8/8.9  Cefas  PU M47     

9.1

Signed Consortium Agreement 9 Ifremer  R  PU M6 30 May 2016 

Signed Consortium Agreement 

(Project Partners only)

9.2

Quality assurance plan   MI/HCMR R PU  M6 19 May 2016  Quality assurance plan 

9.3

 Final report 9  Ifremer  PU M48